SAP C_TS4CO_2021 SAP Certified Application Associate – SAP S/4HANA for Management Accounting Associates (SAP S/4HANA 2021) Online Training
SAP C_TS4CO_2021 Online Training
The questions for C_TS4CO_2021 were last updated at Nov 22,2024.
- Exam Code: C_TS4CO_2021
- Exam Name: SAP Certified Application Associate - SAP S/4HANA for Management Accounting Associates (SAP S/4HANA 2021)
- Certification Provider: SAP
- Latest update: Nov 22,2024
You are configuring internal order settlement .
What do you define which cost element should be settled, using either the original settlement cost elements?
- A . Credit component (of the costing sheet)
- B . Allocation structure
- C . Settlement profile
- D . Settlement rule
You have implemented Product Cost by Sales Oder in conjunction with revenue-based results analysis in your organization.
For a particular sales order item, you have the following:
Plan revenue = 3000; Plan costs = 2000
Actual revenue = 1200; Actual costs = 1000
What data does the system calculate during results analysis?
- A . Revenue = 1200; Cost of sales = 800; Reserve = 200
- B . Revenue = 1200; Cost of sales = 1000; Reserve = 200
- C . Revenue = 1200; Cost of sales = 1000; WIP = 200
- D . Revenue = 1200; Cost of sales = 800; WIP = 200
Which statements best describes a single cost center standard hierarchy?
- A . It is a structure to which all cost center groups create for a controlling area are assigned.
- B . It is a structure to which all cost center groups created within an operating concern are assigned.
- C . It is a structure to which all the cost centers within an operating concern are assigned.
- D . It is a structure to which all the cost centers within a controlling area are assigned.
In the material master record there are three planned prices: ""Planned price 1"", ""Planned price 2""and""Planned price 3"" .
What do you use them for?
- A . To valuate goods movement
- B . To valuate the materials in cost estimates
- C . To valuate material stocks
- D . To update the standard price during the release of a standard cost estimate
Which type of Profitability Analysis updates the cost of goods sold at the time of delivery?
- A . Periodic-accounting based
- B . Both account-based and costing-based
- C . Account-based only
- D . Costing-based only
You create a new profit center .
Which company code(s) is it assigned to by default?
- A . All company codes where profit center accounting is activated.
- B . All company codes maintained in your authorization profile.
- C . All company codes within the controlling area.
- D . All company codes to which the profit center standard hierarchy is assigned to.
Which of the following statements best describe Product Cost by Period? Note: There are 2 correct answers to this question.
- A . It is used when periodic costs outweigh daily postings.
- B . It is used to analyze work in process (WIP) based on actual costs.
- C . It is used when the focus of controlling is on a stable and continuous production process.
- D . It is used in conjunction with a product cost collector.
You are considering using commitment management with internal orders .
What do you need to do in the configuration?
- A . Activate commitment management in both the controlling area and the order type.
- B . Activate commitment management in the controlling area, the order type, and in individual internal order master data.
- C . Activate commitment management in both the version and the order type.
- D . Activate commitment management only in the controlling area.
For which objects can you enter statistical key figures? Note: There are 3 correct answers to this question.
- A . Cost centers
- B . Internal orders
- C . Functional areas
- D . Cost elements
- E . Profit centers
You want to determine which operations of the routing should be considered in a product cost calculation .
How do you do this? Note: There are 2 correct answers to this question.
- A . By marking the cost indicator in the control key assigned to the operation
- B . By marking the Relevance to Costing indicator in the operation
- C . By assigning a cost center to the work center in the operation
- D . By defining a usage key in the header of the routing.