You have a system with 2 identified risks. You determine the probability of one risk occurring is higher than the
You have a system with 2 identified risks. You determine the probability of one risk occurring is higher than the
A . Controlled mitigation effort
B. Risk impact comparison
C. Relative likelihood of event
D. Comparative threat analysis
Answer: C
Latest 512-50 Dumps Valid Version with 404 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund
Subscribe
Login
0 Comments
Inline Feedbacks
View all comments