Which settings have to be made for this?
You want to use capacity availability checks for production orders .
Which settings have to be made for this?
A . A checking rule must be assigned in the checking control
B. The PRT Availability Check must be set in the checking control.
C. An overall profile must be assigned in the checking control.
D. The Relevant for Finite Scheduling indicator must be set
Answer: C,D
Latest C_TS422_1909 Dumps Valid Version with 80 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund
Subscribe
Login
0 Comments
Inline Feedbacks
View all comments