Which two actions are necessary to configure the FlashBlade to use both switches?
A customer is deploying a FlashBlade into a datacenter where the top of rack switches cannot be configured into a single LAG.
Which two actions are necessary to configure the FlashBlade to use both switches? (Choose two.)
A . Create multiple exports
B. Create multiple VIPs
C. Create multiple LAGs
D. Use round robin load balancing
E. Use a multi-chassic configuration.
Answer: C,E